All offices

Ministry · Part XI of BAA No. 85 (FY 2026 GAAB)

Ministry of Public Works

A ministry of the Bangsamoro Government, budgeted as Part XI of the Act. Figures from Bangsamoro Autonomy Act No. 85 — General Appropriations Act of the Bangsamoro, FY 2026, pages 130–150 as printed. How this was compiled
Appropriated for 2026
₱5,770,613,407.00

Appropriated for 2026

Of the whole budget
5.1%

Of the whole budget

Largest of 36 offices
6

Largest of 36 offices

01What kind of spending

Salaries, running costs,and things built.

Of the ₱5,770,613,407.00 this office was given, this is how the Act divides it.

PS8.2%

₱472,767,874.00

Salaries and benefits of the people who work for the region.

MOOE8.8%

₱509,782,969.00

Running everything day to day — supplies, fuel, utilities, training, grants.

CO83%

₱4,788,062,564.00

Things that outlast the year — roads, buildings, equipment, vehicles.

02What it is funded to do

The programsthe Act pays for.

Every office is budgeted under the same three headings — running the office, supporting the work, and the work itself. What is under Operations is what this office actually does.

General Administration and Support

₱154,680,876.00

Support to Operations

₱194,493,948.00

Operations

₱5,421,438,583.00

Road Network and Other Public Infrastructure Facilities Program

₱5,421,438,583.00

Road and Bridge Development Program

₱3,138,660,000.00

Natural Disaster Management Program

₱963,720,000.00

Water System Development Program

₱121,280,000.00

Port Development Program

₱2,510,000.00

Other Programs

₱541,690,000.00

Rows are reproduced as the Act prints them. In several offices Personnel Services is printed against Operations as a whole and not against the programs beneath it, so a column of program rows can total less than the heading above it.

03What it is spent on

Every objectof expenditure.

The other half of the Act: the same money again, sorted by what it buys rather than by what it is for. Salaries by kind, then every running cost down to the fuel and the water bill, then whatever is being built or bought outright.

Personnel Services

₱472,767,874.008.2%

Civilian Personnel

—

Permanent Positions

₱329,845,164.00

Salaries and Wages

₱329,845,164.00

Other Compensation Common to All

₱92,678,194.00

Personnel Economic Relief Allowance

₱16,848,000.00

Representation Allowance

₱2,004,000.00

Transportation Allowance

₱2,004,000.00

Clothing and Uniform Allowance

₱4,914,000.00

Productivity Enhancement Incentives

₱3,510,000.00

Mid-Year Bonus

₱27,487,097.00

Year-End Bonus

₱27,487,097.00

Cash Gift

₱3,510,000.00

Other Personnel Benefits

₱4,914,000.00

Other Benefits

₱50,244,516.00

Retirement and Life Insurance Premiums

₱39,585,756.00

PAG-IBIG Contributions

₱1,684,800.00

Philhealth Contributions

₱8,131,560.00

Employees Compensation Insurance Premiums

₱842,400.00

Maintenance and Other Operating Expenses

₱509,782,969.008.8%

Traveling Expenses

₱26,482,480.00

Training and Scholarship Expenses

₱8,124,550.00

Supplies and Materials Expenses

₱52,868,509.00

Utility Expenses

₱11,467,920.00

Communication Expenses

₱2,472,000.00

Survey, Research, Exploration and Development Expenses

₱163,775,500.00

Extraordinary and Miscellaneous Expenses

₱696,000.00

Professional Services

₱27,216,040.00

General Services

₱16,673,424.00

Repairs and Maintenance

₱168,333,153.00

Taxes, Insurance Premiums and Other Fees

₱5,770,990.00

Other Maintenance and Operating Expensessummed

₱25,902,403.00

Advertising Expenses

₱3,708,000.00

Printing and Publication Expenses

₱3,708,000.00

Representation Expenses

₱10,722,600.00

Transportation and Delivery Expenses

₱1,236,000.00

Rent/Lease Expenses

₱1,082,000.00

Membership Dues and Contributions to Organizations

₱742,800.00

Subscription Expenses

₱2,703,003.00

Other Maintenance and Operating Expenses

₱2,000,000.00

Capital Outlays

₱4,788,062,564.0083%

Infrastructure Asset

₱4,767,860,000.00

Machinery and Equipment

₱17,684,349.00

Transportation Equipment

₱2,200,000.00

Furniture, Fixtures and Books

₱318,215.00

04What the Act requires

7 rules are attachedto this money.

The special provisions for this office: the conditions Parliament put on the ₱5,770,613,407.00 above — who it must reach, what it may not be spent on, and what has to be reported. Quoted in full, because a paraphrase of a rule is a different rule.

Engineering and Administrative Overhead (EAO) Expenses

of which ₱1,000,000.00

Engineering and Administrative Overhead (EAO) Expenses. For infrastructure projects costing more than One Million Pesos (P1,000,000.00), the MPW is authorized to deduct a maximum of three percent (3%) from the appropriation of infrastructure projects but in no case shall it exceed two percent (2%) for releases to the District Engineering Offices (DEOs), to be used for engineering and administrative overhead expenses. For EAO expenses, the same shall be limited to: (i) administrative overhead including the hiring of the individuals engaged through job orders or contracts of service or such other engagement of personnel without any employer-employee relationship; (ii) pre-construction activities after detailed engineering; (iii) construction project management; (iv) testing and quality control; (v) acquisition, rehabilitation and repair of related equipment and parts; and (vi) contingencies in relation to pre-construction activities. The EAO expenses shall be treated or booked-up as capitalized expenditures and form part of the project cost, PROVIDED, that the acquisition of motor vehicles shall only be allowed when it is proven more economical than vehicle rental and that the acquisition thereof is consistent with applicable laws and regulations.

Project Development and Engineering Services

of which ₱163,775,500.00

Project Development and Engineering Services. The amount of One Hundred Sixty-Three Million Seven Hundred Seventy-Five Thousand Five Hundred Pesos (₱163,775,500.00) herein appropriated shall be used for pre-engineering activities subject to the submission of report on pre-engineering works already completed.

Road Network and Other Public Infrastructure Facilities Program

Road Network and Other Public Infrastructure Facilities Program. In the implementation of infrastructure projects, the MPW may consider the following:

  • clustering or de-clustering in the procurement of infrastructure projects for efficiency and effective management with due compliance with R.A. No. 9184 and its IRR and the guidelines issued by the GPPB;
  • adoption of standards for various hazards, global warming or climate change in the feasibility study, design and detailed engineering works of all infrastructure projects, in coordination with the Ministry of Environment, Natural Resources and Energy (MENRE);
  • provision of bike lanes and pedestrian-safe sidewalks as well as roadside tree planting;
  • adoption of standards and provision for safe drinking water facilities; and
  • available and cost-effective Coconet Bio-Engineering Solution for soil erosion control and slope stabilization. The amount herein appropriated for Road Network and Other Public Infrastructure Facilities Program shall be subject to the submission of common engineering documents.

Geo-Tagging of Infrastructure Projects

Geo-Tagging of Infrastructure Projects. For purposes of transparency, the MPW shall undertake the publication of geo-tagged photos with stamp of the sites of all its completed and on going infrastructure projects in its E-BARMM portal and MPWwebsite. The status report of implementation of each project shall likewise be submitted quarterly to MFBM, BPDA and Office of the Chief Minister.

Restriction on Delegation of Project Implementation

Restriction on Delegation of Project Implementation. To ensure the efficient implementation of infrastructure projects, the MPW may delegate in the following instances; (i) the AFP corps of Engineering or equivalent agency as may be authorized by the Office of the Chief Minister in high transportation security risk areas; (ii) inter-department or inter-agency projects; and (iii) LGUs with the capability to implement projects either by administration or contract as determined by MPW, subject to the overall technical supervision of the MPW.

Ensuring Accessibility for Senior Citizens and Persons with Disabilities

Ensuring Accessibility for Senior Citizens and Persons with Disabilities. All projects pertaining to the construction, rehabilitation, and maintenance of public buildings shall include provisions for accessibility facilities such as ramps, handrails, tactile paving, toilets, and paved walk ways as provided in Batas Pambansa 344 R.A. No. 7277, R.A. No. 9994, their respective implementing rules and regulations, and accessible and universal design principles.

Reporting and Posting Requirements

Reporting and Posting Requirements. The implementing M/O/As shall submit quarterly reports on its financial and physical accomplishments, within thirty (30) days after the end of every quarter, through the following:

  • Submission of hardcopy to the MFBM;
  • Submission of reports through electronic means; and
  • Publication to M/O/A's website. The implementing M/O/As shall send written notice when said reports have been submitted or posted on its website to the MFBM and other offices where the submission of reports is required under existing laws, rules and regulations. The date of notice to said M/O/As shall be considered the date of compliance with this requirement.
05What it is building

258 named projects,with the barangay on each.

This office is the only one in the Act whose construction is listed project by project — ₱4,767,860,000.00 across 7 provinces and areas, each with the road, bridge or building it pays for named.